- Ergon Energy Corporation Limited : Supply to Emerald Area Emerging Distribution Network Constraint - 12 Nov 2008
- ENERGEX Project Approval Report: Doboy: Establish 33/11 kV Zone Substation - 11 Nov 2008
- ENERGEX Project Approval Report: Hendra - Replace existing 7.5/10 MV.A 33/11 kV transformer with 1 x 25 MV.A unit - 11 Nov 2008
- ENERGEX Consultation Report : Proposed Network Capacity Augmentation and Reliability Improvement of the Gympie Area - 11 Nov 2008
- ENERGEX Consultation Report - Proposed new 33/11KV zone substation at Buranda (BDA) - 07 Nov 2008
- EnergyAustralia Distribution Network Final Report – Replacement of Raymond Terrace 33/11kV Zone Substation - 05 Nov 2008
- EnergyAustralia Distribution Network Final Report – Tomaree Peninsula 11kV Network Capacity - 04 Nov 2008
- EnergyAustralia Distribution Network Final Report - Establish New Potts Hill Zone Substation - 29 Oct 2008
- Integral Energy Final Report for New Large Network Asset – Establishment of West Parramatta Zone Substation - 27 Oct 2008
- EnergyAustralia Distribution Network Consultation Paper – Augmentation of Tanilba Bay Zone Substation - 27 Oct 2008
- ENERGEX Project Approval Report: Caboolture to Toorbul Point - Establish New 33 kV Overhead Feeder - 23 oct 2008
- ENERGEX Project Approval Report: Gatton Install 2nd 60 MV.A Transformer - 23 Oct 2008
- EnergyAustralia Distribution Network Final Report – Tomago STS and Beresfield STS 33kV Capacitor Installation - 23 Oct 2008
- Ergon Energy Corporation Limited : Consultation & Draft Recommendation – Supply to Cairns Northern Beaches Area Emerging Distribution Network Constraint - 21 Oct 2008
- ElectraNet Summary of Final Report : Maintaining Reliable Electricity Supply To Port Lincoln - 20 Oct 2008
- ENERGEX Project Approval Report: Raceview: Install 2 x 33kV capacitor banks and reconfigure 33kV feeders F359, F360, F509 and F510 - 17 Oct 2008
- ENERGEX Project Approval Report: Spring Creek: Establish 33/11kV Substation - 17 Oct 2008
- EnergyAustralia Distribution Network Final Report : Newcastle CBD Zone 11kV Capacitors - 16 Oct 2008
- Ergon Energy Corporation Limited : Supply To Roma Area Emerging Distribution Network Constraint - 16 Oct 2008
- Powerlink & Transgrid : Potential Upgrade of Queensland / New South Wales Interconnector (QNI) - 13 Oct 2008
- Ergon Energy Corporation Limited Final Report – Supply to South East Townsville Area Emerging Distribution Network Constraint - 08 Oct 2008
- EnergyAustralia Distribution Network Final Report : Replacement of 33kV Feeders to Concord Zone Substation - 07 Oct 2008
- ENERGEX Project Approval Report: Palmwoods Central - Upgrade 33/11 kV Zone Substation - 03 Oct 2008
- EnergyAustralia Distribution Network Final Report : Burwood Zone 11kV Development - 30 Sep 2008
- EnergyAustralia Distribution Network Final Report – Replacement of 33kV Feeders to Riverwood Zone Substation - 24 Sep 2008
- Ergon Energy Corporation Limited : Supply to North West Townsville Area Emerging Distribution Network Constraint - 24 Sep 2008
- Ergon Energy Corporation Limited : Supply to Capricorn Coast Area Emerging Distribution Network Constraint - 24 Sep 2008
- EnergyAustralia Distribution Network Final Report : Pennant Hills 11kV Zone Development - 23 Sep 2008
- ENERGEX Project Approval Report: Belmont: Replace TR1 33/11kV Transformer and 10 x 33 kV Outdoor Circuit Breakers - 23 Sep 2008
- ENERGEX Project Approval Report: Ipswich South : Establish an 11kV feeder to the west with existing circuit breaker - 23 Sep 2008
- ENERGEX Project Approval Report: Lytton Bulk Supply : Install 2nd 33/11 kV Transformer and 11 kV Switchgear - 23 Sep 2008
- ENERGEX Project Approval Report: Lytton Bulk Supply - Install 3rd 80 MV.A 110/33 kV Transformer - 12 Sep 2008
- ENERGEX Project Approval Report: Fisherman's Island: Install New 11 kV Switchroom - 12 Sep 2008
- ENERGEX Project Approval Report: Loganlea – Woodridge: Uprate 33 kV Feeders 407 and 409 - 09 Sep 2008
- ENERGEX Project Approval Report: McLachlan Street: Install Capacitor - 09 Sep 2008
- Ergon Energy Corporation Limited : Request for Information – Supply to Cairns Northern Beaches Area Emerging Distribution Network Constraint - 04 Sep 2008
- Ergon Energy Corporation Limited : Request for Information – Supply to Roma Area Emerging Distribution Network Constraint - 04 Sep 2008
- Ergon Energy Corporation Limited : Consultation & Draft Recommendation – Supply to Emerald Area Emerging Distribution Network Constraint - 04 Sep 2008
- Ergon Energy Corporation Limited : Final Report – Supply to Cannonvale-Airlie Area Emerging Distribution Network Constraint - 04 Sep 2008
- Ergon Energy Corporation Limited : Final Report – Supply to Hervey Bay Area Emerging Distribution Network Constraint - 03 Sep 2008
- Ergon Energy Corporation Limited : Final Report – Supply to Bundaberg Area Emerging Distribution Network Constraint - 03 Sep 2008
- Ergon Energy Corporation Limited : Final Report – Supply to Cairns Area Emerging Distribution Network Constraint - 03 Sep 2008
- Ergon Energy Corporation Limited : Final Recommendation – Supply to Moranbah Area Emerging Distribution Network Constraint - 03 Sep 2008
- ENERGEX Project Approval Report: Cleveland: Construct 33kV Double Circuit Underground Tails and Reconfigure Feeders 375 and 425 - 02 Sep 2008
- ENERGEX Project Approval Report: Boonah: Establish 1x15 MV.A Modular Substation - 02 Sep 2008
- EnergyAustralia Distribution Network Final Report : Cronulla 11kV Zone Development - 01 Sep 2008
- ENERGEX Project Approval Report: Archerfield: Recover 33 kV Switchgear - 29 Aug 2008
- ENERGEX Project Approval Report: Coopers Plains - Replace TR2 Transformer - 29 Aug 2008
- ENERGEX Project Approval Report: Jimboomba: Establish 110/33 kV Bulk Supply Substation - 29 Aug 2008
- ENERGEX Project Approval Report: Mango Hill to Hays Inlet - Establish 33kV feeder - 29 Aug 2008
- ENERGEX Project Approval Report: Middle Ridge - Postman's Ridge: Establish 2nd 110 kV Feeder Utilising Powerlink’s Spare 275 kV Circuit - 29 Aug 2008
- ENERGEX Project Approval Report: Mount Tamborine - Install 2nd 33/11 kV Modular Substation - 29 Aug 2008
- ENERGEX Project Approval Report: Nambour to Yandina - Establish New 33 kV Feeder - 29 Aug 2008
- ENERGEX Project Approval Report: Oxley - Replace Transformer - 29 Aug 2008
- ENERGEX Project Approval Report: Raceview to Kalbar - Upgrade 33 kV Feeder - 29 Aug 2008
- ENERGEX Project Approval Report: Kalbar to Boonah - Establish 2nd 33 kV OH Feeder - 29 Aug 2008
- ElectraNet Application Notice Summary : Proposed New Large Network Asset Eastern Hills Region South Australia - 29 Aug 2008
- VENCorp Proposed Network Augmentation for Brunswick Terminal Station 220/66kV transformation - 28 Aug 2008
- EnergyAustralia Transmission Network Final Report : Development of Kurri 132/11kV Substation - 26 Aug 2008
- Powerlink & Ergon Energy Summary of Final Report : Maintaining a Reliable Electricity Supply to the Bowen Area - 22 Aug 2008
- Powerlink Summary of Final Report : Maintaining a Reliable Electricity Supply to North and Far North Queensland - 22 Aug 2008
- EnergyAustralia Distribution Network Final Report : Berkeley Vale Zone 11kV Development - 14 Aug 2008
- CitiPower Final Report : Brunswick Terminal Station - 14 Aug 2008
- Ergon Energy Corporation Limited : Consultation & Draft Recommendation – Supply to South East Townsville Area Emerging Distribution Network Constraint - 08 Aug 2008
- EnergyAustralia Distribution Network Final Report : Development of Port Botany 33/11kV Zone Substation - 31 Jul 2008
- Country Energy New Large Network Asset - Second 66kV Supply from Koolkhan to Maclean - 29 Jul 2008
- Powerlink New Large Network Asset – Augmenting the transmission network in South East Queensland - 25 Jul 2008
- Country Energy New Large Network Asset: Construction of Second 132kV circuit from Cooma to Bega - 25 Jul 2008
- Ergon Energy Corporation Limited Request For Information : Supply To Emerald Area Emerging Distribution Network Constraint - 22 Jul 2008
- EnergyAustralia Distribution Network Final Report : Establish New 132/11kV Bankstown Zone Substation - 21 Jul 2008
- EnergyAustralia Distribution Network Final Report : Peats Ridge Zone 11kV Development - 18 Jul 2008
- TransGrid - NSW Annual Planning Report 2008 - Public Forum - 18 Jul 2008
- EnergyAustralia Application Notice Summary : Proposed New Large Transmission Network Asset - Establishment of a New 132kV/11kV CBD Zone Substation - 04 Jul 2008
- EnergyAustralia Transmission Annual Planning Report 2008 - 02 Jul 2008
- EnergyAustralia Distribution Network Final Report : A New Distribution Centre at the Premises of S.377 Kimber Lane - Haymarket - 01 Jul 2008
- EnergyAustralia Distribution Network Final Report : Upgrade of Williamtown Zone Substation Transformers - 01 Jul 2008
- EnergyAustralia Distribution Network Final Report : Belrose Zone Augmentation - 01 Jul 2008
- EnergyAustralia Distribution Network Consultation Paper : Development of New Royal North Shore Hospital Zone Substation - 01 Jul 2008
- Ergon Energy Corporation Limited : Consultation & Draft Recommendation – Supply to Cannonvale-Airlie Area Emerging Distribution Network Constraint - 01 Jul 2008
- Ergon Energy Corporation Limited : Supply to Hervey Bay Area - Emerging Distribution Network Constraint - 30 Jun 2008
- Ergon Energy Corporation Limited : Supply to Bundaberg Area - Emerging Distribution Network Constraint - 30 Jun 2008
- Ergon Energy Corporation Limited Request for Information - Supply to South East Townsville Area Emerging Distribution Network Constraint - 27 Jun 2008
- Ergon Energy Corporation Limited Consultation & Draft Recommendation : Supply To Cairns Area Emerging Distribution Network Constraint - 24 Jun 2008
- Ergon Energy Corporation Limited - Request For Information : Supply To Capricorn Coast Area Emerging Distribution Network Constraint - 23 Jun 2008
- Ergon Energy Corporation Limited - Request For Information : Supply To North West Townsville Area Emerging Distribution Network Constraint - 23 Jun 2008
- EnergyAustralia Distribution Network Final Report : Development of New 33kV Feeder from Kurri STS - 18 Jun 08
- Powerlink Application Notice for New Large Network Asset – Augmenting the transmission network in South East Queensland - 30 May 2008
- EnergyAustralia Distribution Network Final Report : New 33kV Terry Hills Feeder - 23 May 2008
- EnergyAustralia Distribution Network Final Report : Refurbishment of Mortdale Zone Substation - 20 May 2008
- EnergyAustralia Distribution Network Consultation Paper : Development of Rathmines 132/11kV Zone Substation - 20 May 2008
- EnergyAustralia Distribution Network Final Report : Development of Two New 33kV Feeders to Brookvale Zone Substation - 19 May 2008
- EnergyAustralia Distribution Network Final Report - Development of New Adamstown 132/11kV Substation - 16 May 2008
- Ergon Energy Corporation Limited Request for Information – Supply to Moranbah Area - Emerging Distribution Network Constraint - 14 May 2008
- Ergon Energy Corporation Limited Request for Information – Supply to Cannonvale-Airlie Area - Emerging Distribution Network Constraint - 14 May 2008
- Ergon Energy Corporation Limited Request for Information – Supply to Cairns Area - Emerging Distribution Network Constraint - 14 May 2008
- EnergyAustralia Distribution Network Consultation Paper – Development of New Balgowlah Zone Substation - 13 May 2008
- EnergyAustralia Distribution Network Final Report : Upgrade of Long Jetty Feeders to 66kV - 06 May 2008
- EnergyAustralia Distribution Network Consultation Paper : Establish New Potts Hill Zone Substation - 05 May 2008
- EnergyAustralia Transmission Network Final Report – Replacement of 132kV feeders 908 & 909 Canterbury to Bunnerong - 30 Apr 2008
- Transgrid & Country Energy Proposed New Large Transmission Network Asset - Development of Electricity Supply to the NSW Far North Coast - 28 Apr 2008
- EnergyAustralia Distribution Network Consultation Paper – Development Port Botany 33/11kV Zone - 15 Apr 2008
- Integral Draft Consultation Paper for New Large Network Asset : Construction of Cawdor Zone Substation - 14 Apr 2008
- EnergyAustralia Distribution Network Final Report – South Punchbowl Zone 11kV Distribution Development - 19 Mar 2008
- ETSA Utilities Evaluation Report - Electricity Supply to the Waterloo to Clare 33kV Distribution Network - 12 Mar 2008
- Country Energy Distribution Network Final Report - Network Augmentation to the Bega - Far South Coast Electricity Supply - 12 Mar 2008
- Transgrid & Powerlink - Potential Upgrade of Queensland / New South Wales Interconnector (QNI) – assessment of optimal timing and net market benefits - 10 Mar 2008
- EnergyAustralia Distribution Network Consultation Paper – Development of New Kurri 132/11kV Substation - 10 Mar 2008
- EnergyAustralia Distribution Network Final Report – North Enfield Area - 11kV Feeder Development - 05 Mar 2008
- Integral Final Report for New Large Network Asset : Augmentation of Nowra Zone Substation - 03 Mar 2008
- Powerlink Network Support Services – North and Far North Queensland - 28 Feb 2008
- EnergyAustralia Distribution Network Consultation Paper : Development of New 33kV Feeder from Kurri STS - 28 Feb 2008
- Transgrid Proposed New Large Transmission Network Asset - Beaconsfield West 330/132 kV Substation Provision of a Third 330/132 kV Transformer - 04 Feb 2008
- EnergyAustralia Distribution Network Consultation Paper – Development of Two New 33kV Feeders to Brookvale Zone Substation - 29 Jan 2008
- EnergyAustralia Distribution Network Final Report : Surry Hills and Campbell St Zone 11kV Development - 25 Jan 2008
- EnergyAustralia Distribution Network Consultation Paper – Development of New Adamstown 132/11kV Substation - 25 Jan 2008
- EnergyAustralia Distribution Network Consultation Paper – Establish New 132/11kV Bankstown Zone Substation - 25 Jan 2008
- Integral Energy Final Report for New Large Network Asset : Establishment of North Eastern Creek Zone Station - 24 Jan 2008
- Integral Energy Final Report for New Large Network Asset : Establishment of East Liverpool Transmission Substation - 24 Jan 2008
- Integral Energy Final Report for New Large Network Asset : Rebuild of Doonside Zone Substation - 24 Jan 2008
- Integral Energy Final Report for New Large Network Asset : Augmentation of Dapto Zone Substation - 24 Jan 2008
- Integral Energy Final Report for New Large Network Asset : Establishment of Caddens Zone Station - 24 Jan 2008
- Integral Energy Consultation Paper for New Large Network Asset : Establishment of West Parramatta Zone Substation - 23 Jan 2008
- Integral Energy Consultation Paper for New Large Network Asset : Augmentation of Windsor Zone Substation - 23 Jan 2008
- Integral Energy Consultation Paper for New Large Network Asset : Rebuild of Hoxton Park Zone Substation - 23 Jan 2008
- EnergyAustralia Transmission Network Final Report – Refurbishment of Ourimbah Sub-Transmission Substation - 14 Jan 2008
- EnergyAustralia Distribution Network Final Report - Development of New Scone 66/33/11kV Substation - 14 Jan 2008
- ElectraNet and ETSA Utilities Proposed New Large Network Asset : Adelaide Central Region South Australia - 14 Jan 2008
- EnergyAustralia Transmission Network Final Report – Development of Electricity Supply to Top Ryde Load Area - 10 Jan 2008
- EnergyAustralia Distribution Network Final Report – Replacement of Mayfield Zone Substation (re-issue) - 07 Jan 2008
- EnergyAustralia Distribution Network Final Report - Lake Munmorah Zone Substation and 11kV Development - 07 Jan 2008
- EnergyAustralia Distribution Network Final Report – Mortdale Zone 11kV Development - Panel 7 and 18 - 03 Jan 2008
- EnergyAustralia Distribution Network Final Report : Flemington Zone Substation - 11kV Distribution Development - 03 Jan 2008
- EnergyAustralia Distribution Network Final Report - Development of Galston 132/11kV Zone substation - 18 Dec 2007
- Transgrid & EnergyAustralia Proposed New Large Transmission Network Asset : Development of Electricity Supply to the Newcastle Area - 13 Dec 2007
- ElectraNet Application Notice Summary : Maintaining Reliable Electricity Supply to Port Lincoln - 04 Dec 2007
- EnergyAustralia Distribution Network Final Report - Development of Supply to the St George Area (Establish Kogarah 132/11kV Zone Substation) - 28 Nov 2007
- Powerlink and Energex - Summary of Final Report - Augmenting the transmission network in north-eastern Brisbane - 23 Nov 2007
- EnergyAustralia Distribution Network Final Report - Upgrade of Sefton Zone substation - 21 Nov 2007
- ETSA Utilities Evaluation Report : Electricity Supply to the Southern Inner Metropolitan Region of Adelaide Issue 3.0 - 19 Nov 2007
- ETSA Utilities Evaluation Report : Electricity Supply to the Tailem Bend to Narrung 33kV network - 19 Nov 2007
- ETSA Utilities Evaluation Report : Electricity Supply to the Yankalilla to Kingscote 33kV Distribution Network - 19 Nov 2007
- ETSA Utilities Evaluation Report : Electricity Supply to the Wudinna to Ceduna 66kV network - 19 Nov 2007
- ETSA Utilities Evaluation Report : Overload of North Adelaide Substation - 19 Nov 2007
- ETSA Utilities Evaluation Report : Electricity Supply to the Northern Suburbs 66kV network - 19 Nov 2007
- EnergyAustralia Distribution Network Consultation Paper – Development of Supply to the Tomaree Peninsula Area - 14 Nov 2007
- EnergyAustralia Distribution Network Final Report - Mosman Zone - 11kV Feeder Development - 12 Nov 2007
- EnergyAustralia Distribution Network Final Report : Rathmines Temporary Substation - 01 Nov 2007
- EnergyAustralia Distribution Network Final Report : Dulwich Hill 11kV Zone Development - 01 Nov 2007
- VENcorp Proposed Funded Network Augmentation : South Morang Terminal Station 220 kV Connection - 30 Oct 2007
- VENcorp Proposed Funded Network Augmentation : Wemen Terminal Station 220 Kv Connection - 30 Oct 2007
- EnergyAustralia Distribution Network Consultation Paper : Development of New Scone 66/33/11kV Substation - 16 Oct 2007
- EnergyAustralia Application Notice : Development of Electricity Supply to Top Ryde Load Area - 16 Oct 2007
- EnergyAustralia Application Notice : Refurbishment of Ourimbah Sub-Transmission Substation - 16 Oct 2007
- Powercor Final Report - Wemen Terminal Station - 10 Oct 2007
- EnergyAustralia Distribution Network Final Report - Development Of A 132kV Substation On Kooragang Island - 05 Oct 2007
- TransGrid & Country Energy Proposed New Large Transmission Network Asset : Development Of Electricity Supply To Port Macquarie - 05 Oct 2007
- Transgrid & Country Energy : Development Of Supply To The Cowra/Forbes/Parkes Area - 05 Oct 2007
- EnergyAustralia Distribution Network Final Report : Pymble Zone Substation 11kV Feeder Development - 04 Sep 2007