NEMMCO has completed a consultation on development of the:
- Generating System Design Data Sheet;
- Generating System Setting Data Sheet; and
- Generating System Model Guidelines,
in accordance with clause S5.5.7 of the National Electricity Rules.
The Data Sheets and Model Guidelines are published below and take effect from 29 February 2008.
The Model Guidelines and clause S5.2.4(b)(6) make reference to the provision of model source code in an unencrypted form suitable for at least one of the software simulation products nominated by NEMMCO. Suitable software formats are:
- PSSTME, version 29, in the form of FLECS code or FORTRAN (PSSTME is a product of Siemens PTI (Power Technologies International));
- PowerFactory, version 13, in unencrypted layered model block diagram format, for any recently published version of Powerfactory (Powerfactory a product of DIgSILENT GmbH); and
- TSATTM, version 7, in User Defined Model form – the source code of any dynamically linked blocks (DLB) must also be provided (TSAT is a component of the DSAToolsTM, a product of Powertech Labs Inc.).
Contact Details
For all enquiries please contact Paul Ravalli.
Final Determination and Report
181Kb |
Generating System Model Guidelines - Final - 29 Feb 2008 filename: 118-0009.pdf |
499Kb |
Generating System Design Data Sheets and Generating System Setting Data Sheets - Final - 29 Feb 2008 filename: 118-0010.pdf |
667Kb |
Generating System Data and Model Guidelines - Determination and Report - 29 Feb 2008 filename: 118-0011.pdf |
1020Kb |
Generating System Design Data Sheets and Generating System Setting Data Sheets - Tables - 29 Feb 2008 filename: 118-0012.pdf |
351Kb |
Generating System Design Data Sheets and Generating System Setting Data Sheets - Tables - 11 Jul 2008 filename: 118-0013.xls |
2nd Stage of Consultation Submissions
| Clean Energy Council | Vestas |
2nd Stage of Consultation
517Kb |
Generating System Data and Model Guidelines Rules Consultation : Draft Determination - 13 Dec 2007 filename: 118-0006.pdf |
513Kb |
Generating System Model Guidelines - 13 Dec 2007 filename: 118-0007.pdf |
2060Kb |
Generating System Design and Setting Data Sheets - 13 Dec 2007 filename: 118-0008.pdf |
35Kb |
Notice of Stage 2 Rules Cosultation : Generating System Data and Model Guidelines Consultation - 13 Dec 2007 filename: 118-0005.pdf |
1st Stage Submissions:
| Alstom | CitiPower & Powercor | ||
| Clean Energy Council | Roaring 40's | ||
| SUZLON | TransGrid |
1st Stage of Consultation
48Kb |
Notice of Rules Cosultation : Generating System Data and Model Guidelines Consultation - 06 Sep 2007 filename: 118-0001.pdf |
677Kb |
Generating System Model Guidelines - 06 Sep 2007 filename: 118-0002.pdf |
2850Kb |
Generating System Design and Setting Data Sheets - 06 Sep 2007 filename: 118-0003.pdf |
256Kb |
Generating System Data and Model Guidelines Rules Consultation Issues Paper - 06 Sep 2007 filename: 118-0004.pdf |