Power System Operations > System Operating Procedures > ST PASA SO_OP3703

Short Term Reserve Assessment SO_OP3703

The purpose of this procedure is to provide NEMMCO operations staff with sufficient guidelines to perform the processes associated with Short Term PASA.

This procedure details the method of performing the following processes.

  • Preparation and publishing of Short Term Projected Assessment of System Adequacy (ST PASA) as required by the National Electricity Market Rules section 3.7.3.
  • checking ST PASA outputs for adequate reserves and informing market participants if the minimum reserve requirements are not satisfied.
  • if the market mechanisms do not provide sufficient generation to meet the requirements of reliable operating state of the power system, this procedure details the further action to be taken by NEMMCO and lists the other NEMMCO procedures to be referred to under such circumstances.

For further information on this document, please contact: Robert Rigoni, Power System Operations Manager.

 

pdf icon
199Kb

  Short Term Reserve Assessment SO_OP3703 - 03 Dec 2008
  Version 6
  filename: so_op3703v006.pdf

 

 

 

Copyright © November, 2008 NEMMCO. All rights reserved. Access to and use of this site (including information or material contained in or accessed from this site) is subject to our Disclaimer and Reservation of Rights